Case Study 1
Link:
In this case, the primary objective is to design the temporary construction facilities layout aimed at minimizing the total travelling distance of site workers between different facilities. The site layout has 11 facilities and 11 location. Side gate and main gate are fixed location while others are not. The list of facilities used in this case study is as follows:
- Site office (F1)
- Falsework workshop (F2)
- Labour residence (F3)
- Storeroom 1 (F4)
- Storeroom 2 (F5)
- Carpentry workshop (F6)
- Reinforcement steel workshop (F7)
- Side gate (F8, fixed to L1)
- Electrical, water and other utilities control room (F9)
- Concrete batch workshop (F10)
- The main gate (F11, fixed to L10)
Case Study 2
Link:
In this study case, a real case study obtained from Fung, Wong, Tam and Tong (2014) was used. Detail explanation can be found in the following link: https://www.tandfonline.com/doi/abs/10.1080/15623599.2008.10773115
Case Study 3
Link:
In this study case, a real case study obtained from Fung et al. (2008) was used. Detail explanation can be found in the following link: https://www.tandfonline.com/doi/abs/10.1080/15623599.2008.10773115