Master Degree Lab Member

Master Degree Students

INTAKE 2020

    • Badrun – LULUS 2022 – [Judul]
    • Fredlina – LULUS 2022 – [Judul]
    • Badrun – LULUS 2022 – [Judul]
    • Indra – LULUS 2022 – [Judul]
    • Natalia – LULUS 2022 – [Judul]
    • Ryo – LULUS 2022 – [Judul]
    • Silvester – LULUS 2022 – [Judul]

INTAKE 2019

    • Arrie Wicaksono – LULUS 2021 – GMF –
      Penjadwalan Pekerja Shift di Masa Pandemi
    • Dio Fawwas – LULUS 2021 – [Judul]
    • Dafit – LULUS 2021 – [Judul]
    • Made- LULUS 2021 – [Judul]
    • Marco- LULUS 2021 – [Judul]
    • Reza – LULUS 2021 – [Judul]
    •  
  •  

Undergraduate Lab Member

Undergraduate Students

INTAKE 2016

    • Ina Dwi Lasmana – Lulus 2020 – Shopee Express
      Mathematical programming approach for solving the container stowage problem
    • Adistya Yunisty Ambarwati – Lulus 2020 – SAMUDERA PERDANA SELARAS
      Penentuan Kebijakan Inventory Pada Central Kitchen di Restoran XYZ
    • Fatikhatuz Zahra – LG 2016
      Penentuan Rute Distribusi Tabung Gas LPG 3 Kg di PT Kurnia Cipinang Jaya Menggunakan Algoritma Simulated Annealing
    • Handina Boedhy Astiana – Lulus 2020 – Mamikos 
      Penentuan Rute Dua Eselon dalam Proses Pemetaan Bencana dengan Algoritma Simulated Annealing
    • Nandini Niramaya Sekaringtyas – Lulus 2020 –  PT Pertamina Lubricants
      Implementasi Algoritma Tabu Search untuk Penentuan Rute Kombinasi Kendaraan Darat dan Drone pada Pemetaan Area Terdampak Bencana
    • Prima Arinda Nurul Islami – Lulus 2020 – CILOGS
      Implementasi Algoritma Symbiotic Organisms Search pada Vehicle Routing Problem with Time Windows (Studi Kasus : Distribusi Produk Central Kitchen Mangsi)
    • Raihan Ahmad Fadhil – Lulus 2020 – MNC GROUP
      Perancangan Sistem Informasi Pengelolaan Persediaan Bahan Baku di Central Kitchen Mangsi

CSLP Dataset

Case Study 1

Link: 

In this case, the primary objective is to design the temporary construction facilities layout aimed at minimizing the total travelling distance of site workers between different facilities. The site layout has 11 facilities and 11 location. Side gate and main gate are fixed location while others are not. The list of facilities used in this case study is as follows:

  1. Site office (F1)
  2. Falsework workshop (F2)
  3. Labour residence (F3)
  4. Storeroom 1 (F4)
  5. Storeroom 2 (F5)
  6. Carpentry workshop (F6)
  7. Reinforcement steel workshop (F7)
  8. Side gate (F8, fixed to L1)
  9. Electrical, water and other utilities control room (F9)
  10. Concrete batch workshop (F10)
  11. The main gate (F11, fixed to L10)

Case Study 2

Link:

In this study case, a real case study obtained from Fung, Wong, Tam and Tong (2014) was used. Detail explanation can be found in the following link: https://www.tandfonline.com/doi/abs/10.1080/15623599.2008.10773115

Case Study 3

Link: 

In this study case, a real case study obtained from Fung et al. (2008) was used. Detail explanation can be found in the following link: https://www.tandfonline.com/doi/abs/10.1080/15623599.2008.10773115